SAM.gov · Solicitation

70--SERVER,AUTOMATIC DA, IN REPAIR/MODIFICATION OF

  • Verified from source 20 days ago
  • Updated 20 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS PHILADELPHIA | NAVSUP WEAPON SYSTEMS SUPPORT
Type
Solicitation
Kind
contract
Posted
Aug 28, 2026
NAICS
333998
Place
Notice ID
ca06f83eb8a14f39a97e19664bf2ac16
Source
SAM.gov
First seen
Aug 31, 2026, 5:21 AM UTC

Full scope

n762.43 P2R 771-229-0536 [email protected] TBD TBD TBD See Schedule TBD TBD 12 months 60 days after discovery of defect Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to ac…

n762.43 P2R 771-229-0536 [email protected] TBD TBD TBD See Schedule TBD TBD 12 months 60 days after discovery of defect Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 110 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. THIS IS AN ALRE NON-CRITICAL ITEM. NAVSUP WSS REFERENCE ONLY: REI 26-22039 WAS UTILIZED IN SUPPORT OF THIS SOLICIATION/CONTRACT. \

Contacts

Full record synced 20 days ago from SAM.gov (data extract)