SAM.gov · Solicitation
16--FUSE-HYDRAULIC,AIRC, IN REPAIR/MODIFICATION OF
- Verified from source 24 days ago
- Updated 24 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS PHILADELPHIA | NAVSUP WEAPON SYSTEMS SUPPORT
- Type
- Solicitation
- Kind
- contract
- Posted
- Aug 26, 2026
- NAICS
- 336413
- Place
- —
- Notice ID
- b3ba41d8d6e1492aa5e202acbc5b616b
- Source
- SAM.gov
- First seen
- Aug 27, 2026, 2:54 AM UTC
Full scope
P5B 771-229-0507 [email protected] Source/source TBD TBD TBD See schedule TBD TBD 12 months 60 days after discovery of defect Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccur…
P5B 771-229-0507 [email protected] Source/source TBD TBD TBD See schedule TBD TBD 12 months 60 days after discovery of defect Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in this contract. Required RTAT: 365 days after receipt of assetThroughput Constraint: Contractor must provide a throughput Constraint forEach NSN(s). Total assets to be repaired monthly after initial deliverycommences X/month (contractor fill in #). A throughput of ##____ per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection andacceptance of all assets inducted under this contract. The parties have agreedto a price (shown on the schedule page) for each unit at the negotiated RTAT.Such prices are based on the Contractor meeting the RTAT requirementsdescribed within the schedule page. If the Contractor does not meet theapplicable RTAT requirement, consideration will be assessed and subject tonegotiation. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. Early and incremental deliveries accepted. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Triumph Actuation Systems; drawing number ( ;97415; ) ;2-8020-28; , Revision ;Latest; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disa…
Contacts
-
Telephone: 2156972606
Related links
Full record synced 23 days ago from SAM.gov (data extract)