SAM.gov · Solicitation

VALVE,REGULATING,FL

  • Verified from source 20 days ago
  • Updated 20 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS PHILADELPHIA | NAVSUP WEAPON SYSTEMS SUPPORT
Type
Solicitation
Kind
contract
Posted
Aug 28, 2026
NAICS
332919
Place
Notice ID
a37959d28f7a445cb45234888aada9f4
Source
SAM.gov
First seen
Aug 31, 2026, 5:21 AM UTC

Full scope

B4T 771-229-0614 [email protected] TBD TBD TBD 12 MONTHS 60 DAYS UPON NOTICE OF DEFECT This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receiptof the F-condition asset at the contractor?s facility as reflected in the Action Dateentry in the commercial Asset Visibility (CAV) system. In accordance with the CAVStatement of Wor…

B4T 771-229-0614 [email protected] TBD TBD TBD 12 MONTHS 60 DAYS UPON NOTICE OF DEFECT This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receiptof the F-condition asset at the contractor?s facility as reflected in the Action Dateentry in the commercial Asset Visibility (CAV) system. In accordance with the CAVStatement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 485 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.2.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: VALVE,REGULATING,FL ;VALVE,REGUALTING,FL 4820-01-317-7769; NSN , ;70974 123SCEC5020-17; Part Number, Shall be performed IAW: VALVE,REGULATING,FL ;N/A; Publication (s). 1.2.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NORTHROP GRUMMAN SYSTEMS CORP; drawing number ( ;70974; ) ;123SCEC5020-17; , Revision ;LATEST; and all details and specifications referenced therein. 1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back…

Contacts

Full record synced 20 days ago from SAM.gov (data extract)