SAM.gov · Solicitation

W9123726QA100 - Bulkhead Crane Bus Rails Replacement at Captain Anthony Meldahl Locks and Dam

  • Verified from source 10 days ago
  • Updated 10 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE ARMY | US ARMY CORPS OF ENGINEERS | ENGINEER DIVISION GREAT LAKES AND OHIO | ENDIST HUNTINGTON | W072 ENDIST HUNTINGTON
Type
Solicitation
Kind
contract
Posted
Sep 9, 2026
NAICS
238210
Place
Notice ID
a68e2cc387e04d04a26bb2ab101ac53f
Source
SAM.gov
First seen
Sep 10, 2026, 7:40 AM UTC

Full scope

This requirement is to furnish all labor, equipment, and materials to remove the existing Bulkhead Crane bus rail system and furnish and install a new four-bar, 500-amp aluminum bus rail system consisting of three-phase, 480V power with ground, approximately 1,400 feet per bar, including associated hardware, eight (8) new collector shoes, and electrical expansion couplings. Repair or replace approximately 50 percent of the existing protective bus rail covers, supports, and associated hardware, and modify existing covers as necessary to provide complete coverage of the new bus rail system.

This requirement is to furnish all labor, equipment, and materials to remove the existing Bulkhead Crane bus rail system and furnish and install a new four-bar, 500-amp aluminum bus rail system consisting of three-phase, 480V power with ground, approximately 1,400 feet per bar, including associated hardware, eight (8) new collector shoes, and electrical expansion couplings. Repair or replace approximately 50 percent of the existing protective bus rail covers, supports, and associated hardware, and modify existing covers as necessary to provide complete coverage of the new bus rail system.

Contacts

Full record synced 10 days ago from SAM.gov (data extract)