SAM.gov · Solicitation
Amendment 3: Solicitation- WT 18058173 Airfield and Weather Flight Carpet Replacement
- Verified from source 16 days ago
- Updated 18 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE AIR FORCE | FA2517 21 CONS BLDG 350
- Type
- Solicitation
- Kind
- contract
- Posted
- Sep 11, 2026
- NAICS
- 238330
- Place
- Colorado Springs, CO
- Notice ID
- c3f60e53a06247d8a6306aea6fbb1a34
- Source
- SAM.gov
- First seen
- Sep 14, 2026, 12:41 PM UTC
Full scope
This project entails the removal and replacement of flooring approximately 4,370 square foot of carpet on the first floor of Building 122, Peterson Space Force Base (PSFB). The contractor will coordinate with the 21st Civil Engineering Squadron (21 CES) to conduct bio-environmental screening for hazardous materials beneath the existing flooring. Once cleared, the contractor will remove the old carpet and rubber cove base, managing daily site clean-up and off-base debris disposal, as on-site equipment storage is strictly prohibited. To prepare the space, the contractor will relocate standard f…
This project entails the removal and replacement of flooring approximately 4,370 square foot of carpet on the first floor of Building 122, Peterson Space Force Base (PSFB). The contractor will coordinate with the 21st Civil Engineering Squadron (21 CES) to conduct bio-environmental screening for hazardous materials beneath the existing flooring. Once cleared, the contractor will remove the old carpet and rubber cove base, managing daily site clean-up and off-base debris disposal, as on-site equipment storage is strictly prohibited. To prepare the space, the contractor will relocate standard furniture --coordinating with the Government to ensure all IT cables, power cords, and personal items are removed beforehand. The installation phase requires laying new, commercial-grade modular carpet tiles or planks directly over the existing vinyl flooring using low-VOC adhesives. The contractor will also install a new vinyl cove base, trim door bottoms for proper clearance, and perform any necessary wall spackling and painting to repair damage caused during the removal of the old baseboards. The project will conclude with the repositioning of all furniture and a final Quality Assurance acceptance inspection conducted by 21 CES Operations Flight personnel. Please see attached Combo Solicitation and attachments for detailed information required.
Contacts
-
Stephen Carr
-
Earl Tenoso
Related links
Full record synced 18 days ago from SAM.gov (data extract)