MyFloridaMarketPlace (MFMP) Vendor Bid System · Invitation to Bid

225164 Camp Blanding Joint Training Center Power Distribution Upgrade

  • Verified from source 1 day ago
  • Updated 24 days ago
  • Amendment detected
Agency
Department of Military Affairs (DMA)
Office
DMA
Type
Invitation to Bid
Kind
contract
Posted
Jun 23, 2026
Place
Tallahassee, FL
Source
MyFloridaMarketPlace (MFMP) Vendor Bid System
First seen
Aug 26, 2026, 6:44 PM UTC

Full scope

Addendum #1 is attached below. Bidders must acknowledge Addendum 1 in their proposal and subcontractor's list. Addendum #1 includes a revised scope of work, pre-bid meeting agenda and sign in sheet, revised proposal / subcontractor's list and Addendum #1 including answers to bidders questions.

Addendum #1 is attached below. Bidders must acknowledge Addendum 1 in their proposal and subcontractor's list. Addendum #1 includes a revised scope of work, pre-bid meeting agenda and sign in sheet, revised proposal / subcontractor's list and Addendum #1 including answers to bidders questions.

INVITATION TO BID

Solicitation Date: June 25, 2026

PROPOSALS ARE REQUESTED FROM QUALIFIED, LICENSED GENERAL OR ELECTRICAL CONTRACTORS BY THE STATE OF FLORIDA, DEPARTMENT OF MILITARY AFFAIRS HEREINAFTER REFERRED TO AS OWNER, FOR CONSTRUCTION OF:

PROJECT NUMBER: 225164

PROJECT NAME & LOCATION: Camp Blanding Joint Training Center Primary Power Distribution Upgrade, 5629 State Road 16 West, Starke, FL 32922

ESTIMATED COST OF CONSTRUCTION: $ 1,800,000.00

FOR: The Florida Army National Guard, Construction & Facility Management Office

POTENTIAL RESPONDENTS TO THE SOLICITATION ARE ENCOURAGED TO CAREFULLY REVIEW ALL THE MATERIALS CONTAINTED HEREIN AND PREPARE RESPONSES ACCORDINGLY.

General Project Description (See Bid Documents for complete details): This project will upgrade the primary voltage power distribution system at Camp Blanding as part of the Phase IV improvements. The work includes a main Base Bid and seven Alternate Bid Items. Each item has its own attachment that shows the specific pole locations and the exact work to be completed. The system being upgraded operates at 13,200 /22,860 volts. The project will replace or improve existing primary power components to enhance safety, reliability, and long‑term performance of the installation’s electrical distribution network.

Building must meet Florida Building Code, State Fire Marshall, local Authorities Having Jurisdiction and Area Water Management requirements, and any other permits and fees required by other county, local or state authorities.

BUILDING PERMITS – The Construction Contractor is obligated to obtain and pay for a building permit from the local authority for construction of this State facility with the exception of the Fire Marshal. The State Fire Marshal has jurisdiction over any new construction, renovations, or alterations to any existing state-owned building or state-leased space in order to comply with uniform fire safety standards.

(1) In the case of building, plumbing, electrical, other internal system permits and connection permits, the Contractor is obligated to obtain such permits and pay such fees.

(2) The Construction Contractor shall determine the permits and fees required by any entity having jurisdiction over any part of the project and shall include the cost of all such permits and fees, e.g. impact fees, in its bid proposal.

(3) The State Fire Marshal has jurisdiction over all State Facilities. The Owner will apply for and pay for the permit by the State Fire Marshal.

QUALIFICATION: Each bidder whose field is governed by Chapter 399, 455, 489, and 633 of the Florida Statutes for licensure or certification must submit qualification data of their eligibility Form FNG 5085 Contractor’s Experience Questionnaire and Financial Statement with their bid at the time of the bid opening.

"Contractors are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, sub-awards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The Department of Military Affairs (DMA) shall comply with the DOD implementation of 2 CFR Part 180 (at 2 CFR Part 1125) by checking the Excluded Parties List System (EPLS

Documents (10)

Contacts

Full record synced 23 days ago from mfmp-public-detail