SAM.gov · Solicitation

DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

  • Verified from source 5 days ago
  • Updated 5 days ago
  • Amendment detected
Agency
DEPT OF DEFENSE
Office
DEPT OF THE ARMY | US ARMY CORPS OF ENGINEERS | ENGINEER DIVISION PACIFIC OCEAN | ENDIST JAPAN | W2SN ENDIST JAPAN
Type
Solicitation
Kind
contract
Posted
Sep 13, 2026
NAICS
237120
Place
Notice ID
7dbef03b804f4ec3b055eb15101df6e7
Source
SAM.gov
First seen
Sep 14, 2026, 12:41 PM UTC

Full scope

Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an exi…

Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Contacts

Full record synced 10 days ago from SAM.gov (data extract)