SAM.gov · Special Notice
PLA Special Notice FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222
- Verified from source 3 days ago
- Updated 3 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE ARMY | US ARMY CORPS OF ENGINEERS | ENGINEER DIVISION NORTHWESTERN | ENDIST SEATTLE | W071 ENDIST SEATTLE
- Type
- Special Notice
- Kind
- contract
- Posted
- Sep 25, 2026
- NAICS
- 236220
- Place
- 0, WA
- Notice ID
- 4ca158ffc3d24a9b83429ee9612c50a9
- Source
- SAM.gov
- First seen
- Sep 26, 2026, 2:42 PM UTC
Full scope
USACE Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as the Hammer Heads . The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: a) Hazardous material / debris abatement and removal mostly within the crawl space b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc. c) Removal at ~ 90% removal of building mechanical electrical systems d) Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: e) New exterior envelope f) New building mechanical electrical systems g) New Thermoplastic Polyolefin (TPO) Roof system h) Painting of exteriors Other considerations for site work coordination: i) New utility connections (mostly by other entities) j) Shared construction boundaries with adjacent current and future projects
Contacts
-
Cassandra Gonzalez
-
Shawna West
Related links
Full record synced 3 days ago from SAM.gov (data extract)