SAM.gov · Solicitation

Tar Lake Superfund

  • Verified from source 5 days ago
  • Updated 5 days ago
  • Amendment detected
Agency
DEPT OF DEFENSE
Office
DEPT OF THE ARMY | US ARMY CORPS OF ENGINEERS | ENGINEER DIVISION GREAT LAKES AND OHIO | ENDIST DETROIT | W072 ENDIST DETROIT
Type
Solicitation
Kind
contract
Posted
Sep 12, 2026
NAICS
562910
Place
Notice ID
57c08b9b71c14e23933637a0e909dc2f
Source
SAM.gov
First seen
Sep 14, 2026, 12:41 PM UTC

Full scope

*****Amendment 0001 ******Amendment 0001 is being issued to update the Specifications, Bid Schedule, and Scoping Statement in response to bidder inquiries received. CLIN 0007 is changed from Environmental Remediation Services to Construction. Amendment 0001 also updates the Wage Determinations found in Section L Instructions, Conditions, and Notices to Offerors or Quoters. All other terms and conditions remain UNCHANGED. ********************************************The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed Price (FFP) environmental servi…

*****Amendment 0001 ******Amendment 0001 is being issued to update the Specifications, Bid Schedule, and Scoping Statement in response to bidder inquiries received. CLIN 0007 is changed from Environmental Remediation Services to Construction. Amendment 0001 also updates the Wage Determinations found in Section L Instructions, Conditions, and Notices to Offerors or Quoters. All other terms and conditions remain UNCHANGED. ********************************************The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed Price (FFP) environmental services contract for the Tar Lake Superfund project located in Mancelona Township, Michigan. The project includes the excavation of contaminated soil and expansion of a bio-sparge system at the Tar Lake Superfund Site in Mancelona Township, Ml. The project will involve excavation of approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the biosparge system compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing bio-sparge system piping, confirmation soil sampling,and site restoration.

Contacts

Full record synced 14 days ago from SAM.gov (data extract)