SAM.gov · Solicitation

RADIO ALTIMETER,AIR

  • Verified from source 24 days ago
  • Updated 24 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS PHILADELPHIA | NAVSUP WEAPON SYSTEMS SUPPORT
Type
Solicitation
Kind
contract
Posted
Aug 26, 2026
NAICS
334511
Place
Notice ID
942c152f1fd44062b0ae2556860d9594
Source
SAM.gov
First seen
Aug 27, 2026, 2:54 AM UTC

Full scope

P5D 771-229-0534 [email protected] Invoice and receiving report (combo) type n/a TBD TBD TBD See schedule TBD wss 12 months 45 days after discovery of defect THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOTAN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE, WHICH CAN BEOBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER "COMMODITIES". OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE C…

P5D 771-229-0534 [email protected] Invoice and receiving report (combo) type n/a TBD TBD TBD See schedule TBD wss 12 months 45 days after discovery of defect THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOTAN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE, WHICH CAN BEOBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER "COMMODITIES". OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND/OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: RADIO ALTIMETER,AIR ;822-0334-002; P/N, ;0RH 5841 015808081 P8; NSN, ;Available repair manuals, drawings and specifications per p/n requirements.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to draw…

Contacts

Full record synced 23 days ago from SAM.gov (data extract)