SAM.gov · Solicitation
58--THERMAL IMAGING SYS
- Verified from source 1 month ago
- Updated 1 month ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Type
- Solicitation
- Kind
- contract
- Posted
- Aug 28, 2026
- NAICS
- 334511
- Place
- —
- Notice ID
- a96f5665de3c47559534bf719c86c34c
- Source
- SAM.gov
- First seen
- Aug 31, 2026, 5:21 AM UTC
Full scope
to be determined to be determined to be determined to be determined WSS REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (DEV 2026-O0048)(MAR 2026)) firm fixed price The purpose of this amendment is to: Remove FAR 52.213-4 and WSSTERMMZ01. The Government is requesting a delivery date of 180 days after award. \ If your company has a Basic Ordering Agreement (BOA) for the items under thissolicitation, the following applies to this solicitation and the resultantcontract: This solicitation ?resultant order? is issued under and pursua…
to be determined to be determined to be determined to be determined WSS REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (DEV 2026-O0048)(MAR 2026)) firm fixed price The purpose of this amendment is to: Remove FAR 52.213-4 and WSSTERMMZ01. The Government is requesting a delivery date of 180 days after award. \ If your company has a Basic Ordering Agreement (BOA) for the items under thissolicitation, the following applies to this solicitation and the resultantcontract: This solicitation ?resultant order? is issued under and pursuant to theprovisions of the Basic Ordering Agreement (BOA). The terms and conditions ofthe Agreement are hereby incorporated by reference and, except as providedherein by this order, remain in full force and effect. If any conflict arisesin the terms of this solicitation ?resultant order? order versus the terms inthe BOA, the terms of the BOA shall apply. OFFERORS SHALL SUBMIT PROPOSALS VIA NECO OR EMAIL ONLY. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the THERMAL IMAGING SYS . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The THERMAL IMAGING SYS furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 7287197; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to p…
Contacts
-
Telephone: 7712290543
Related links
Full record synced 1 month ago from SAM.gov (data extract)