SAM.gov · Presolicitation

61--SENSOR POWER DRAWER, IN REPAIR/MODIFICATION OF

  • Verified from source 1 day ago
  • Updated 1 day ago
  • Deadline extended
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
Type
Presolicitation
Kind
contract
Posted
Sep 18, 2026
Place
Notice ID
f307585d8f564e3b8cd384ceac730103
Source
SAM.gov
First seen
Sep 18, 2026, 1:21 PM UTC

Full scope

CPY N/A [email protected] Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material N/A TBD TBD TBD SW3117-2;SW3218-1 TBD N/A N/A N/A N/A N/A N/A N/A WSS CS One year from date of delivery. One year from date of delivery. 365 days LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997) 600 employees The subject amendment it hereby incorporated to. The purpose of this solicitation amendment is to change the closing date to 21 September 2026. Please contact the POC Amelia Harper via email [email protected] you have any question…

CPY N/A [email protected] Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material N/A TBD TBD TBD SW3117-2;SW3218-1 TBD N/A N/A N/A N/A N/A N/A N/A WSS CS One year from date of delivery. One year from date of delivery. 365 days LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997) 600 employees The subject amendment it hereby incorporated to. The purpose of this solicitation amendment is to change the closing date to 21 September 2026. Please contact the POC Amelia Harper via email [email protected] you have any questions or concerns in regards to the amendment orrequirement. All other terms and conditions remain unchanged. \ 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or set be other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the offeror must provide a signed letter of authorization as a distributor on the OEM's letterhead. 5. If requirement will be packaged at a location different from the Offeror's address, the Offeror shall provide the Name, Street Address and CAGE of the Packaging Facility. 6. Any contract awarded as a result of this solicitation will be DO/DX certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 7. Please provide repair price as Estimated (EST) for the full repair effort ofthe requirement. 8. Vendor shall have 90 days after receipt of carcass(es) to complete a teardown & evaluation (TD&E) of the carcass(es) and submit a Firm-Fixed Price(FFP) quote for the full repair effort of the carcass(es). 9. When submitting a quote, please include the cost of new (actual or estimated) for evaluation purposes. 10. Quote shall specify any exceptions including but not limited to MIL-STD Packaging, MIL-STD Labeling, Inspection & Acceptance locations, Packaging House, surplus materials, etc. If no exceptions are indicated or received, award shall be based upon solicitation requirements. Changes or requests for changes after award shall be subject to consideration costs deducted from the unit price. 11. In repair price, include all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information: a. Teardown & Evaluation Rate: b. Repair Turn Around Time (RTAT): c. Throughput Constraint: d. Induction Expiration Date: 12. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. a. Requested RTAT: 44 Days 13. Quotes shall reference the proposed RTAT and any capacity constraints. 14. The Contracting Officer (KO) reserves the right to exercise the option SubCLIN with 365 days of the effective date of this award. The contractor will provide the same delivery time and price listed in the schedule. A modification shall be completed at the time the option is exercised and all current contract terms and conditions shall apply to the option quantity…

Contacts

Full record synced 14 days ago from SAM.gov (data extract)