SAM.gov · Solicitation
59--ELECTRONIC COMPONEN, IN REPAIR/MODIFICATION OF
- Verified from source 3 days ago
- Updated 5 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Type
- Solicitation
- Kind
- contract
- Posted
- Sep 24, 2026
- NAICS
- 334412
- Place
- —
- Notice ID
- faf0b33a17894027a5a18a2f57dd8a7d
- Source
- SAM.gov
- First seen
- Sep 26, 2026, 2:42 PM UTC
Full scope
n741.p13 n00104 771-229-0591 [email protected] invoice and receiving reports (combo) n/a n00104 n/a n/a n/a n/a n/a 1 year after date of delivery 45 days after discovery of defect Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with…
n741.p13 n00104 771-229-0591 [email protected] invoice and receiving reports (combo) n/a n00104 n/a n/a n/a n/a n/a 1 year after date of delivery 45 days after discovery of defect Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract. Required RTAT: ## ____ days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint foreach NSN(s). Total assets to be repaired monthly after initial delivery commences X/month. A throughput of ##____ per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUPWSS Contracting Officer. All contractual documents related to the instant procurement are considered tobe "issued" by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce methods, such asemail. The Governments acceptance of the contractors proposal constitutesbilateral agreement to "issue" contractual documents as detailed herein. According to FAR 52.204-8: (1) The North American Industry Classification System (NAICS) code for this acquisition is 334412. (2) The small business size standard is 750. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the ELECTRONIC COMPONEN . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-1686 C A 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ELECTRONIC COMPONEN repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;830P9 W155122H; 3.2 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in ANSI/ESD S20.20, "ESD Association Standard for the Development of an Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)", which superseded MIL-STD-1686C. 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been gi…
Contacts
-
Telephone: 2156970000
Related links
Full record synced 3 days ago from SAM.gov (data extract)