SAM.gov · Solicitation

PWA ENCODER

  • Verified from source 20 days ago
  • Updated 20 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
Type
Solicitation
Kind
contract
Posted
Aug 28, 2026
NAICS
334290
Place
Notice ID
c1a7f38fb20e4209a5569cc8c38178ac
Source
SAM.gov
First seen
Aug 31, 2026, 5:21 AM UTC

Full scope

TBD TBD TBD TBD TBD TBD TBD WSS [email protected] 365 DAYS Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issuedThe Government is seeking a Repair Turnaround Time (RTAT) of: 229 DAYSGovernment Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset VisibiliYour quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Pr…

TBD TBD TBD TBD TBD TBD TBD WSS [email protected] 365 DAYS Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issuedThe Government is seeking a Repair Turnaround Time (RTAT) of: 229 DAYSGovernment Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset VisibiliYour quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement i Check one: Firm-fixed-Price ___ Estimated ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current ^^^^^^^^^^^^^^^TESTING AND EVALUATION IF BEYOND REPAIR^^^^^^^^^^^^^^^ T&E fee/price (if asset is determined BR/BER): AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same ^^^^^^^^^^^^^^^ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW^^^^^^^^^^^^^^^ New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PWA ENCODER . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PWA ENCODER repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;27192 MC-014473-01; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, e…

Contacts

Full record synced 20 days ago from SAM.gov (data extract)