SAM.gov · Solicitation
48--MANIFOLD ASSEMBLY - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF
- Verified from source 7 days ago
- Updated 7 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Type
- Solicitation
- Kind
- contract
- Posted
- Sep 22, 2026
- NAICS
- 332919
- Place
- —
- Notice ID
- cf47c4f0bfb54e3e8b8a54ce09b0b453
- Source
- SAM.gov
- First seen
- Sep 22, 2026, 2:01 PM UTC
Full scope
WG3 771-229-0456 [email protected] TBD TBD TBD TBD ALISON HARPER AT [email protected] Amendment to extend solicitation and update clauses. See continuation pages for details. This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, par…
WG3 771-229-0456 [email protected] TBD TBD TBD TBD ALISON HARPER AT [email protected] Amendment to extend solicitation and update clauses. See continuation pages for details. This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 250 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT o Unit Price:__________ o Total Price:__________ o Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ Return Material Authorization # (RMA), if applicable:__________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER):___________ AWARDEE INFO & PERFORMANCE LOCATION o Awardee CAGE:__________ Inspection & Acceptance CAGE, if not same as "awardee CAGE":__________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the MANIFOLD ASSEMBLY . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-129 P A 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The MANIFOLD A…
Contacts
-
Telephone: 7712290456
Related links
Full record synced 5 days ago from SAM.gov (data extract)