SAM.gov · Solicitation

AMPLIFIER,LOW POWER

  • Verified from source 14 days ago
  • Updated 14 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
Type
Solicitation
Kind
contract
Posted
Sep 4, 2026
NAICS
334290
Place
Notice ID
37f656be7bb14a7b89c2cc783851ef60
Source
SAM.gov
First seen
Sep 6, 2026, 5:39 AM UTC

Full scope

EPA [email protected] COMBO N/A TBD TBD TBD TBD WSS [email protected] 365 DAYS The purpose of this amendment is to: 1. Update the QTY for CLIN 0003 to 12 and 2. Update the QTY for CLIN 0004 to 6 All other terms and conditions remain the same. \ PLEASE PROVIDE PRICE AS FIRM-FIXED. AWARD WILL BE ISSUED AS FOB ORIGIN. OFFERORS ARE REQUESTED TO ADVISE IF YOU HAVE A SEPARATE MANUFACTURING OR PACKAGING FACILITY CAGE. PLEASE SUBMIT OFFERS BY EMAIL DIRECTLY TO [email protected] BY THE OFFER DUE DATE SPECIFIED ON PAGE 1 OF THIS SOLICITATION. Include repa…

EPA [email protected] COMBO N/A TBD TBD TBD TBD WSS [email protected] 365 DAYS The purpose of this amendment is to: 1. Update the QTY for CLIN 0003 to 12 and 2. Update the QTY for CLIN 0004 to 6 All other terms and conditions remain the same. \ PLEASE PROVIDE PRICE AS FIRM-FIXED. AWARD WILL BE ISSUED AS FOB ORIGIN. OFFERORS ARE REQUESTED TO ADVISE IF YOU HAVE A SEPARATE MANUFACTURING OR PACKAGING FACILITY CAGE. PLEASE SUBMIT OFFERS BY EMAIL DIRECTLY TO [email protected] BY THE OFFER DUE DATE SPECIFIED ON PAGE 1 OF THIS SOLICITATION. Include repair price with all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. All transportation to/from repair site will be paid for by US Navy. Price Reductions Any assets for which the contractor does not meet the required RTAT will incur a price reduction of 1% per unit. This adjustment will be implemented via a Reconciliation Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. Reconciliation A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, the price adjustment as stated shall be applicable. The government retains the OPTION to order an additional quantity up to 100% of this order for a period 365 DAYS ARO at the same price. The government may choose to exercise this option or not. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the CONTROL,MODULATOR . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CONTROL,MODULATOR repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;982P6 CA51147-001 ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written cha…

Contacts

Full record synced 14 days ago from SAM.gov (data extract)