SAM.gov · Solicitation

48--VALVE,CHECK

  • Verified from source 3 days ago
  • Updated 3 days ago
  • Amendment detected
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
Type
Solicitation
Kind
contract
Posted
Sep 25, 2026
NAICS
332919
Place
—
Notice ID
9cc2953eee9a4e4d8b533017767271a7
Source
SAM.gov
First seen
Sep 26, 2026, 2:42 PM UTC

Full scope

WVD 771-229-2110 [email protected] See specifications Section C and Section E. TBD TBD TBD TBD TBD TBD B Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material N/A TBD TBD TBD TBD N/A N/A N/A N/A N/A N/A See form DD1423 WSS One year from date of delivery. One year from date of delivery. 365 DAYS 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e.…

WVD 771-229-2110 [email protected] See specifications Section C and Section E. TBD TBD TBD TBD TBD TBD B Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material N/A TBD TBD TBD TBD N/A N/A N/A N/A N/A N/A See form DD1423 WSS One year from date of delivery. One year from date of delivery. 365 DAYS 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods suchas email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) andthe offeror must provide a signed letter of authorization as a distributor on the OEM's letterhead. 5. If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 6. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 7. Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 8. The option provision is included in the event the Government has an additional requirement 365 DAYS after issuance of the award. This will authorize the Government to add the additional quantity, up to the percentage cited, tothe order, via modification without having to re-solicit. 9. It is requested that pricing be submitted on the option provision. 10. Evaluation for the award of the proposed requirement will be based upon thelowest aggregate total price submitted for the total quantity, inclusive of theoption provision. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to…

Contacts

Full record synced 3 days ago from SAM.gov (data extract)