SAM.gov · Solicitation
POWER SUPPLY
- Verified from source 7 days ago
- Updated 7 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Type
- Solicitation
- Kind
- contract
- Posted
- Sep 11, 2026
- NAICS
- 335931
- Place
- —
- Notice ID
- 7b40406946154410a230715e4eac0988
- Source
- SAM.gov
- First seen
- Sep 12, 2026, 8:40 AM UTC
Full scope
AAJ (771)229-0567 [email protected] Invoice and receiving report (COMBO) See schedule See schedule The terms and conditions under BOA N0010426GBE01 apply. Please quote a FFP or NTE price for the full repair of the item(s). The vendor is required to comply with the Commercial Asset Visibility (CAV) of the asset(s) in this purchase order in accordance with NAVSUPWSSFA24 All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either…
AAJ (771)229-0567 [email protected] Invoice and receiving report (COMBO) See schedule See schedule The terms and conditions under BOA N0010426GBE01 apply. Please quote a FFP or NTE price for the full repair of the item(s). The vendor is required to comply with the Commercial Asset Visibility (CAV) of the asset(s) in this purchase order in accordance with NAVSUPWSSFA24 All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such asemail. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Please note that all REPAIR AWARDS will be pre-populated with the following Award Remarks: RTAT, Throughput Constraint, and Induction Expiration Date included in SUBCLIN remarks above are defined as follows: RTAT: Repair turn-around time defined as Induction start date to end date (days). Throughput Constraint: Total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflects no throughput constraint. Induction Expiration Date: Any asset received after this date in days is not authorized to be repaired without bi-lateral agreement between the Vendor and Contracting Officer. SUBCLIN Remarks (pre-populated for each SUBCLIN) RTAT=0000 Throughput Constraint=0000/month Induction Expiration Date=000 (NTE 365 days) Please provide all of the above information with contractor's quote. Any questions should bedirected to the POC for this solicitation. The Government intends to add an option quantity to the resultant contract. Inreference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The ContractingOfficer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless theparties otherwise agree. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the POWER SUPPLY . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The POWER SUPPLY repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;52088 B516; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item,…
Contacts
-
Telephone: 7176055805
Related links
Full record synced 7 days ago from SAM.gov (data extract)