SAM.gov · Solicitation
48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF
- Verified from source 24 days ago
- Updated 24 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Type
- Solicitation
- Kind
- contract
- Posted
- Aug 26, 2026
- NAICS
- 332919
- Place
- —
- Notice ID
- 97b6d8c65ab34abe82c585010ea15c8a
- Source
- SAM.gov
- First seen
- Aug 27, 2026, 2:54 AM UTC
Full scope
AE2 771-229-0381 [email protected] TBD TBD TBD TBD The purpose of this amendment is to extend the offer due to 22 September 2026, to allow offerors time submit a fair and reasonable proposal. Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnar…
AE2 771-229-0381 [email protected] TBD TBD TBD TBD The purpose of this amendment is to extend the offer due to 22 September 2026, to allow offerors time submit a fair and reasonable proposal. Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 40 days. Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints. _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ TESTING AND EVALUATION IF BEYOND REPAIR Teardown & Evaluation fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price: __________ New unit delivery lead-time: __________ NOTE All REPAIR AWARDS will be pre-populated with the following Award Remarks: RTAT, Throughput Constraint, and Induction Expiration Date included in SUBCLIN remarks above are defined as follows: RTAT: Repair turn-around time defined as Induction start date to end date (days). Throughput Constraint: Total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflects no throughput constraint. Induction Expiration Date: Any asset received after this date in days is not authorized to be repaired without bi-lateral agreement between the Vendor and Contracting Officer. SUBCLIN Remarks (pre-populated for each SUBCLIN) RTAT=0000 Throughput Constraint=0000/month Induction Expiration Date=000 (NTE 365 days) Any questions should be directed to the…
Contacts
-
Telephone: 7712290381
Related links
Full record synced 23 days ago from SAM.gov (data extract)