SAM.gov · Solicitation
ACTUATOR,ELECTRO-PH
- Verified from source 10 days ago
- Updated 10 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Type
- Solicitation
- Kind
- contract
- Posted
- Sep 9, 2026
- NAICS
- 332919
- Place
- —
- Notice ID
- b5fd5f513cb94ba39ff84457a665dbf6
- Source
- SAM.gov
- First seen
- Sep 10, 2026, 7:40 AM UTC
Full scope
BSH N/A [email protected] TBD TBD TBD WSS 750 EMP THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION DUE DATE UNTIL 16OCT26 AND UPDATE THE QUANTITY TO 18. ALL OTHER TERMS AND CONIDITIONS REMAIN UNCHANGED. POC FOR THIS REQUIREMENT IS JACOB DAVIS N7M2.9 [email protected]. THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION DUE DATE TO 27 MAR 2026. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. POC FOR THIS AMENDMENT IS JACOB DAVIS N7M2.9 AT [email protected]. THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION UNTIL 13 FEB 26.…
BSH N/A [email protected] TBD TBD TBD WSS 750 EMP THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION DUE DATE UNTIL 16OCT26 AND UPDATE THE QUANTITY TO 18. ALL OTHER TERMS AND CONIDITIONS REMAIN UNCHANGED. POC FOR THIS REQUIREMENT IS JACOB DAVIS N7M2.9 [email protected]. THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION DUE DATE TO 27 MAR 2026. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. POC FOR THIS AMENDMENT IS JACOB DAVIS N7M2.9 AT [email protected]. THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION UNTIL 13 FEB 26. POC FOR THIS AMENDMENT IS JACOB DAVIS N7M2.9 [email protected].^^ THE PURPOSE OF THIS AMENDMENT IS TO INCREASE THE QUANITY BY THREE UNITS AS SHOWN ON THE SCHEDULE PAGE BELOW AND EXTEND THE OFFER DUE BY DATE. Accelerated delivery is encouraged and accepted before the delivery date(s) "All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issueThe Government is seeking a Repair Turnaround Time (RTAT) of: 190 days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset VisibiliYour quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement i Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current ^^^^^^^^^^^^^^^TESTING AND EVALUATION IF BEYOND REPAIR^^^^^^^^^^^^^^^ T&E fee/price (if asset is determined BR/BER): If an item is determined BR, a The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same ^^^^^^^^^^^^^^^ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW^^^^^^^^^^^^^^^ New unit price:__________ New unit delivery lead-time:__________ ""ALL PRICING IS FIRM. PLEASE CONSIDER THE FOLLOWING WHEN PROVIDING PRICE: Include repair price with all costs associated with receipt and complete repai"The Government intends to add an option quantity to the resultant contract. I""IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - aIn reference to the above important note, the contractor provides the following 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the ACTUATOR,ELECTRO-PH . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ACTUATOR,ELECTRO-PH repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair stan…
Contacts
-
Electronic Mail: [email protected]
Related links
Full record synced 10 days ago from SAM.gov (data extract)