SAM.gov · Combined Synopsis/Solicitation
Sector San Diego- UPH - 05 Bathrooms Renovation
- Verified from source 8 days ago
- Updated 8 days ago
- Deadline extended
- Agency
- HOMELAND SECURITY, DEPARTMENT OF
- Office
- US COAST GUARD | BASE LOS ANGELES/LONG BEACH(00037)
- Type
- Combined Synopsis/Solicitation
- Kind
- contract
- Posted
- Sep 11, 2026
- NAICS
- 236118
- Place
- San Diego, CA
- Notice ID
- 89b6e6bccdc1468d974cbbc2f9b73b51
- Source
- SAM.gov
- First seen
- Sep 12, 2026, 8:40 AM UTC
Full scope
PROJECT & ACQUISITION DETAILS Location: USCG Sector San Diego, Building C-2, San Diego, CA Scope: Complete renovation of two (2) UPH bathrooms (approx. 120 sq. ft. each). Labor Standard: Davis-Bacon Act (DBA) Prevailing Wage Requirements (San Diego County, CA) Material Standard: Standard Commercial Grade Hazardous Material Policy: Non-disturbance of wall ACM; Lead-safe work practices and waste characterization for tile demolition required. WBS Element - Scope Description 1.0 Demolition & HAZMAT Lead-safe demo of flooring, fixtures, and partitions in 2 bathrooms. Includes containment, monitori…
PROJECT & ACQUISITION DETAILS Location: USCG Sector San Diego, Building C-2, San Diego, CA Scope: Complete renovation of two (2) UPH bathrooms (approx. 120 sq. ft. each). Labor Standard: Davis-Bacon Act (DBA) Prevailing Wage Requirements (San Diego County, CA) Material Standard: Standard Commercial Grade Hazardous Material Policy: Non-disturbance of wall ACM; Lead-safe work practices and waste characterization for tile demolition required. WBS Element - Scope Description 1.0 Demolition & HAZMAT Lead-safe demo of flooring, fixtures, and partitions in 2 bathrooms. Includes containment, monitoring, and specialized waste characterization/disposal. 2.0 Flooring Furnish and install approx. 240 sq. ft. of new heavy-duty waterproof vinyl flooring. 3.0 Plumbing (New) Furnish and install all new toilets, urinals, sinks, showers, valves, and flushometers for two bathrooms. 4.0 Fixtures (New) Furnish and install new toilet partitions, shower pans, mirrors, and dispensers for two bathrooms. 5.0 Testing & Closeout Reconnect all utilities, perform full functional and leak testing with unit POC, and conduct final site cleanup. Please see attached SOW for further details.
Contacts
-
Frank Rodriguez
-
Duncan Clark
Related links
Full record synced 16 days ago from SAM.gov (data extract)