SAM.gov · Solicitation

7G20--FY26 NRM - Install Analog Phone Line to Building 6 - 610A4-26-510

  • Verified from source 10 days ago
  • Updated 10 days ago
  • Amendment detected
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Office
VETERANS AFFAIRS, DEPARTMENT OF | 250-NETWORK CONTRACT OFFICE 10 (36C250)
Type
Solicitation
Kind
contract
Posted
Sep 9, 2026
NAICS
238210
Place
Fort Wayne, IN
Notice ID
cc798478133548eea812dce843c13838
Source
SAM.gov
First seen
Sep 10, 2026, 7:40 AM UTC

Full scope

This is a total small business (SB) set aside . The agency seeks information from interested, eligible, and qualified small businesses for execution of this project. Proposals are being requested or accepted at this time. This is a solicitation, and a contract will be awarded based on this synopsis. Please see the notices below and follow the information on the SF1442. THE PROJECT REQUIREMENTS: The contractor will provide all labor, equipment, materials, and supervision required to furnish and install cabling to reconnect the pedestrian blue call pole communication line between Buildings 3 an…

Set-aside eligible

This is a total small business (SB) set aside . The agency seeks information from interested, eligible, and qualified small businesses for execution of this project. Proposals are being requested or accepted at this time. This is a solicitation, and a contract will be awarded based on this synopsis. Please see the notices below and follow the information on the SF1442. THE PROJECT REQUIREMENTS: The contractor will provide all labor, equipment, materials, and supervision required to furnish and install cabling to reconnect the pedestrian blue call pole communication line between Buildings 3 and 6 to the VA system at 2121 Lake Avenue, Fort Wayne, IN 46805. I. SPECIFIC: To include: Remove the old cable that is being replaced. Install a new 25-pair CAT 3 cable from the OIT Telecommunication Room in the basement of Building 3 to the basement of Building 6, approximately 700 feet in length Terminate all pairs of the new cable at both ends, connecting to the existing 100-pair Building Entrance Protect in Building 3 and the 66-block in Building 6 The cable pathway between buildings will use the existing duct bank, which includes multiple permitted confined-space underground access vaults for cable installation Firestopping material in the OIT Telecommunication Room must be removed to install the cable and then properly restored The period of performance is 60 days after signed notice to proceed.

Contacts

Full record synced 12 days ago from SAM.gov (data extract)