SAM.gov · Presolicitation

J065--INSTALL LEAD BASED LINERS / 544 - Columbia SC - VA Medical Center

  • Verified from source 2 days ago
  • Updated 2 days ago
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Office
VETERANS AFFAIRS, DEPARTMENT OF | 247-NETWORK CONTRACT OFFICE 7 (36C247)
Type
Presolicitation
Kind
contract
Posted
Sep 17, 2026
NAICS
238390
Place
Notice ID
ebf00d5f9d6647d5abd7bfda20e50869
Source
SAM.gov
First seen
Sep 18, 2026, 1:21 PM UTC

Full scope

STATEMENT OF WORK Lead-Based Liners 1. REQUIREMENT: This requirement is for a one-time service to supply and hang lead-based liners in the Dental Clinic, on behalf of the Columbia Healthcare System, WJB Dorn VA Medical Center located in Columbia South Carolina. 2. BACKGROUND: The WJB Dorn VA Medical Center (VAMC) is a 216-bed facility, encompassing acute medical, surgical, psychiatric, and long-term care. The hospital is located in Columbia, South Carolina and provides primary, secondary, and some tertiary care. 3. PERIOD OF PERFORMANCE: Period of performance is based upon award date and shal…

STATEMENT OF WORK Lead-Based Liners 1. REQUIREMENT: This requirement is for a one-time service to supply and hang lead-based liners in the Dental Clinic, on behalf of the Columbia Healthcare System, WJB Dorn VA Medical Center located in Columbia South Carolina. 2. BACKGROUND: The WJB Dorn VA Medical Center (VAMC) is a 216-bed facility, encompassing acute medical, surgical, psychiatric, and long-term care. The hospital is located in Columbia, South Carolina and provides primary, secondary, and some tertiary care. 3. PERIOD OF PERFORMANCE: Period of performance is based upon award date and shall not exceed one three (3) months. Work shall be performed during the tentative hours of 6:00p.m. through Midnight, Sunday through Friday. Excluding all federally observed holidays. At this time no overtime is authorized. Federal Holidays New Year s Day January 1st Martin Luther King s Birthday 3rd Monday in January President s Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25 4. PLACE OF PERFORMANCE: WJB Dorn VA Medical Center 6439 Garners Ferry Road Columbia, SC 29209 5. PERFORMANCE REQUIREMENTS: A Contracting Officer Representative (COR) and/or Alternate Contracting Officer Representative (ACOR) shall be assigned to this procurement, and written notification will be provided to the Contractor after award. Scheduling of work performance shall be arranged through the designated COR/ACOR assigned. The Contractor shall a provide and hang, lead-based liners on a wall in the Dental Clinic. The Contractor shall furnish all labor, travel, equipment, supplies and materials required to perform installation of lead-based liners. The Contractor shall complete a one-time service to supply and hang lead-based liners in an area of the Dental Clinic. Supply and hang lead-based lined boards 101 square foot wall area to be covered with lead-based liners. Measurements and quantity of lead-based liners are up to the contractor; however, the minimum quantity necessary should be utilized. All 101 square feet must be covered. Liners must be American Society for Testing and Materials (ASTM) C1396/C1396M specifications Vertical height: max up to 7 high Lead thickness: 1/16 After liners are hung; supply Level 4 finishing per ASTM C840 and clean up all debris. The Contractor shall ensure that the area is clearly blocked off when commencement of work occurs so that no traffic of personnel disrupts the installation. CHECK-IN REQUIREMENTS: Contractor and all Contractor s Service Personnel shall check in and out in the Engineering Control Center, B.100 prior to performing and upon completion of all required service. This information is required to contact mechanics in case of an emergency during regular hours. SAFETY REQUIREMENTS: Contractor shall ensure all tools and equipment are always secured. Tools and equipment must be removed from open areas or stored in secured location during breaks, lunch, and/or at the end of each workday. All debris must be removed from the facility upon completion of service each day. The WJB Dorn VA Medical Center is a smoke free campus. Site Visitation Although not mandatory, a site visit will be offered and attendance is highly recommended. Date and time will be coordinated between the Contracting Officer and the COR and be posted in the requirement solicitation. No questions will be asked during the site visit. All questions will be emailed directly to the Contracting Point of Contract listed in the solicitation. All questions submitted, and answers received from the COR, will be posted as an amendment in the solicitation. 6. INVOICES: a. Payment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor and submitted through Tungsten Network (formerly known as OB10) http://www.tun…

Contacts

Full record synced 2 days ago from SAM.gov (data extract)