SAM.gov · Combined Synopsis/Solicitation

Refurbish Lift Station - FCI Cumberland

  • Verified from source 8 days ago
  • Updated 8 days ago
Agency
JUSTICE, DEPARTMENT OF
Office
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FCI CUMBERLAND
Type
Combined Synopsis/Solicitation
Kind
contract
Posted
Sep 11, 2026
NAICS
237110
Place
Cumberland, MD
Notice ID
4915e49c9f5e4def9c5d19229eca4f5b
Source
SAM.gov
First seen
Sep 12, 2026, 8:40 AM UTC

Full scope

Description: The Federal Bureau of Prisons (FBOP), FCI Cumberland, intends to issue a solicitation to refurbish the institution s wastewater lift station. Work includes demolition and removal of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of new lift station equipment; electrical upgrades; controls modernization; testing; commissioning; and staff training. All work must maintain continuous sewage system operation and comply with Federal, State, Local, NEC, NFPA 820, OSHA, and FBOP security requirements. Place of Performance: Federal Corr…

Description: The Federal Bureau of Prisons (FBOP), FCI Cumberland, intends to issue a solicitation to refurbish the institution s wastewater lift station. Work includes demolition and removal of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of new lift station equipment; electrical upgrades; controls modernization; testing; commissioning; and staff training. All work must maintain continuous sewage system operation and comply with Federal, State, Local, NEC, NFPA 820, OSHA, and FBOP security requirements. Place of Performance: Federal Correctional Institution Cumberland 14601 Burbridge Rd. SE Cumberland, MD 21502 Scope of Work Includes: (See attached Statement of Work) Removal and disposal of existing lift station equipment. Installation of new stainless?steel NEMA 4X control panel with PLC/relay logic, VFDs, starters, surge protection, HOA switches. New level?sensing system with redundancy and audio/visual alarms. Installation of new grinder, auger, diverters, three wet?well pumps, and three spare pumps. Replacement of incoming disconnects, automatic transfer switch, and associated wiring. Upgraded grounding, conduits, surge/lightning protection, and fail?safe logic. Full functional testing, hydrostatic testing, manufacturer startup, and calibration. Minimum 6 hours of on?site training and provision of all as?built documentation, O&M manuals, warranties, schematics, and PLC programming. Evaluation Factors: Award will be made on best value. Price, past performance, and specifications will be evaluated. Quotes are due September 25, 2026. 10 AM (EST) Please email quotes to Brian Logsdon at [email protected] using the provided SF1449 (15B10727Q00000015) Please provide UEI, email, company name, complete box 30A, 30B, and 30C, total aggregate price, and total calendar days for project completion.

Contacts

Full record synced 8 days ago from SAM.gov (data extract)