SAM.gov · Combined Synopsis/Solicitation

R--JEFF - Utility Mapping

  • Verified from source 12 days ago
  • Updated 14 days ago
Agency
INTERIOR, DEPARTMENT OF THE
Office
NATIONAL PARK SERVICE | MWR MISSOURI MABO(62000)
Type
Combined Synopsis/Solicitation
Kind
contract
Posted
Sep 5, 2026
NAICS
561990
Place
Saint Louis, MO
Notice ID
22dddd43fef040ad9a489c4ddd8f8050
Source
SAM.gov
First seen
Sep 8, 2026, 6:39 AM UTC

Full scope

Amendment 3: Clarification on scope of work and intent of utility mapping: This requirement is for a general survey of utility locations and irrigation systems for reference by the park maintenance staff. This survey will be used in the future to diagnose failures in the irrigation system and serve as a general reference for utility locations. This utility locating is not being performed in preparation for construction projects involving ground disturbance. Any future construction projects would require a utility location to be performed at that time and is not a part of this requirement. The…

Amendment 3: Clarification on scope of work and intent of utility mapping: This requirement is for a general survey of utility locations and irrigation systems for reference by the park maintenance staff. This survey will be used in the future to diagnose failures in the irrigation system and serve as a general reference for utility locations. This utility locating is not being performed in preparation for construction projects involving ground disturbance. Any future construction projects would require a utility location to be performed at that time and is not a part of this requirement. The end product of this survey will be digital and paper maps displaying the location of the aforementioned subsurface irrigation and utility lines. Site Visit Q&A: 1. The deliverable states a PDF - however the NPS uses GIS - geographic information systems and GPS/GNSS to map at high accuracy location of utilities. Can you confirm the deliverable format ?- we would recommend geodatabases with features layers for each of the utilities. And or Shape files in addition to a pdf. PDFs are not good for planning, maintenance and design you want to be able to go out with a receiver and locate mapped assets. A: It is not required but If the contractor provided GIS data in addition to that would be of benefit. I spoke with our GIS specialist, and they asked that if GIS data is sent, please send it in GIS ESRI file geodatabase format projected to UTM Zone 15, NAD83 (2011) 2. Does the NPS have any historical design or as-built documents for this property? Please confirm the following - please indicate what you have in the list below -Irrigation Plan and or design drawings -Planting Plan and or design drawings -Electrical Plan and or design drawings -Stormwater Management Plan or design drawings A: Yes, we have these as-builts and drawings. 3. For the above question, if these plans are available please confirm if they are in a digital format and if they what digital format. If they are paper only and scanned, please indicate that as well. A: We have paper, scanned, and digital copies. 4. Can contractor use a UTV with a towable locate device to conduct the survey? A: We would not allow UTVs or vehicles off paved surfaces. 5.The SOW states the entire property marked for utilities is approximately 91 acres then references approximately 45 acres. A: The approximately 45 acres is referencing the turf, and landscaped areas (non-paved surfaces). We have a general idea of the current utility locations, and the majority of the utilities are located in these areas and normally only cross under sections of paved surface. 6. Can drones be used? The general policy of the National Park Service is that drones may not be used as recreational use of drones is prohibited. An exception to this policy may be obtained provided the contractor can provide a reasonable explanation for why a drone must be utilized. Drone pilot will be required to have and provide the necessary Federal Aviation Administration Commercial Remote Pilot licensure. 7. Can contractor use marking paint and/or other marking devices? A: Yes, we would ask though that the contractor limit markings as much as possible and refrain from any marking on improved surfaces (e.g. concrete, pavement, etc.) Amendment 2 - Provide updated copy of courtesy copy of combined synopsis-solicitation. Amendment 1 - Remove provision 52.228-1 Bid Guarantee (1) Not Applicable (2) 26 August (3) 2026 (4) Contracting Office Zip: 63123 (5) Product Service Code: R404 - Land Surveys (6) National Park Service Contracting Operations Central, Missouri Major Acquisition Buying Office (7) Request for Quotes for Leveling of Sidewalks in Gateway Arch NP (8) 140P6226Q0007 (9) Closing Response Date: 10 September 2026 (10) Contracting Officer: [email protected] (11-15) Not Applicable (16) Description: (i) This is a combined synopsis/solicitation for a commercial item / commercial services being procured in accordance with the format in…

Contacts

Full record synced 14 days ago from SAM.gov (data extract)