SAM.gov · Combined Synopsis/Solicitation

Big Springs Horse Corral Replacement

  • Verified from source 5 days ago
  • Updated 5 days ago
Agency
AGRICULTURE, DEPARTMENT OF
Office
FOREST SERVICE | BRIDGER-TETON NATIONAL FOREST
Type
Combined Synopsis/Solicitation
Kind
contract
Posted
Sep 24, 2026
NAICS
238990
Place
Moran, WY
Notice ID
9cb4a1f8242643b681eba8f83c18a82f
Source
SAM.gov
First seen
Sep 24, 2026, 2:22 PM UTC

Full scope

This project includes supply and installation of steel oil pipe for one 20'x60' corral with three pens and concrete for post embedment, including temporary traffic control. Local traffic shall be closed during construction with temporary traffic control measures inplace. Including sign stating horse corrals are closed to public for the duration of project. Optional work that may be awarded includes all work described above associated with: 1.Option #1: Supply and construct one additional 20'x60' corral with three pens. 2.Option #2: Supply and install hitching rail.

This project includes supply and installation of steel oil pipe for one 20'x60' corral with three pens and concrete for post embedment, including temporary traffic control. Local traffic shall be closed during construction with temporary traffic control measures inplace. Including sign stating horse corrals are closed to public for the duration of project. Optional work that may be awarded includes all work described above associated with: 1.Option #1: Supply and construct one additional 20'x60' corral with three pens. 2.Option #2: Supply and install hitching rail.

Contacts

Full record synced 3 days ago from SAM.gov (data extract)