SAM.gov · Solicitation
16--LEADING EDGE
- Verified from source 9 days ago
- Updated 9 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS PHILADELPHIA | NAVSUP WEAPON SYSTEMS SUPPORT
- Type
- Solicitation
- Kind
- contract
- Posted
- Sep 11, 2026
- NAICS
- 336413
- Place
- —
- Notice ID
- 4b750b891f97408dbdced9812b45958e
- Source
- SAM.gov
- First seen
- Sep 12, 2026, 8:40 AM UTC
Full scope
M3R 771-229-0582 [email protected] Invoice and Receiving Report Combo Inspection site source Final acceptance site source TBD TBD TBD TBD A7 This RFP is for a Spares buy and will be using competitive procedures. The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement. This solicitation is for the Spares of 4 units of National Stock Number (NSN)1RD 1680 016241425 V2. Induction Period The induction period for the initial units in this order is 365 calendar…
M3R 771-229-0582 [email protected] Invoice and Receiving Report Combo Inspection site source Final acceptance site source TBD TBD TBD TBD A7 This RFP is for a Spares buy and will be using competitive procedures. The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement. This solicitation is for the Spares of 4 units of National Stock Number (NSN)1RD 1680 016241425 V2. Induction Period The induction period for the initial units in this order is 365 calendar days from the date of contract award. The Government reserves the right to extend this period by an additional 365 days, for a total of two years. Any unused induction slots from the initial year may be carried over into the second year. Pricing and Options The contractor shall propose option pricing for a maximum of 15 units over the entire contract period, inclusive of the initial quantity. if pricing will change after the first 365 days, please provide separate pricing for the second year. Contract Award The Government reserves the right to place the initial order for any number of units up to the specified maximum. For threshold purposes, the total contract value will be calculated by multiplying the highest proposed unit price by the maximum number of units. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following ac…
Contacts
-
Telephone: 2156972198
Related links
Full record synced 9 days ago from SAM.gov (data extract)