SAM.gov · Solicitation

51--BRUSH,WIRE,BOILER T

  • Verified from source 9 days ago
  • Updated 9 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
Type
Solicitation
Kind
contract
Posted
Sep 11, 2026
NAICS
333991
Place
Notice ID
4df5375589f94d0085d9e615ec7314ec
Source
SAM.gov
First seen
Sep 12, 2026, 8:40 AM UTC

Full scope

GE1 N/A [email protected] B N.A GE1 N/A N/A N/A N/A N/A 1 YEAR AFTER DATE OF DELIVERY 45 DAYS AFTER DISCOVERY OF DEFECT 180 DAYS 180 DAYS This procurement requirement is for quantity 215 BRUSH, WIRE, BOILER, T (NSN 1HM 5130 015552991) This requirement is 100 Percent set-aside for small businesses. The Government will issue an award resulting from this Request for Quotation (RFQ) to the responsible offeror whose quotation, conforming to the solicitation, results in the best value to the Government, considering both price and non-price factors. The following factors will be used…

Set-aside small businesses

GE1 N/A [email protected] B N.A GE1 N/A N/A N/A N/A N/A 1 YEAR AFTER DATE OF DELIVERY 45 DAYS AFTER DISCOVERY OF DEFECT 180 DAYS 180 DAYS This procurement requirement is for quantity 215 BRUSH, WIRE, BOILER, T (NSN 1HM 5130 015552991) This requirement is 100 Percent set-aside for small businesses. The Government will issue an award resulting from this Request for Quotation (RFQ) to the responsible offeror whose quotation, conforming to the solicitation, results in the best value to the Government, considering both price and non-price factors. The following factors will be used to evaluate competitive offers received in response to this RFQ: 1. Price 2. Non-Price Factors 1. Delivery Lead Time. The proposed delivery lead times and schedules will be evaluated and the proposed delivery lead time considered to be in the best interset of the Government will be rated higher than other delivery lead time proposed. 2. Past Performance. The offeror's past performance on related contracts will be evaluated to determine, as appropriate, succesful performance of contract requirements, quality and timeliness of delivery of goods and services, cost management, communications between contracting parties, proactive management, and customer satisfaction. All non-price evaluatios, when combined, are approximately equal to price. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the BRUSH,WIRE,BOILER T . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-STD-129 P A DOCUMENT REF DATA=ISO9001 A 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The BRUSH,WIRE,BOILER T furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;52213 GTC-211-11/16IN 768R4 GTC-211-11/16IN; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated…

Contacts

Full record synced 9 days ago from SAM.gov (data extract)