SAM.gov · Solicitation
VALVE,GATE
- Verified from source 3 days ago
- Updated 3 days ago
- Agency
- DEPT OF DEFENSE
- Office
- DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
- Type
- Solicitation
- Kind
- contract
- Posted
- Sep 17, 2026
- NAICS
- 332919
- Place
- —
- Notice ID
- c215acf6b2d243ddb61f7a39f08addbe
- Source
- SAM.gov
- First seen
- Sep 18, 2026, 1:21 PM UTC
Full scope
WVA n/a [email protected] A combo n/a tbd n00104 tbd tbd n50286 TBD n/a See form DD1423 WSS one year from date of delivery One year from date of delivery 365 days from award date If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. This item is on the qualified products list (QPL). Only those items which have been tested and approved in accordance with the qualification requirements of the specifications will…
WVA n/a [email protected] A combo n/a tbd n00104 tbd tbd n50286 TBD n/a See form DD1423 WSS one year from date of delivery One year from date of delivery 365 days from award date If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. This item is on the qualified products list (QPL). Only those items which have been tested and approved in accordance with the qualification requirements of the specifications will be acceptable for consideration. Award is subject to the QPL requirements. Any new vendor not on the QPL must first do the steps to be added before any offer will be considered. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers. Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. FOB Destination. Vendor must be ISO9001. Please provide proof with your quote Unanswered questions below will constitute an inadequate quote. Questions to answer within your quote, in addition to your price per unit___________ : 1. Delivery Lead Time for first batch of units: __________________________ 2. If more than one unit to build, after shipping the first batch, the number of assets able to ship each month thereafter ________ 3. Offer valid until ___________________. 4. Source Inspection Location (CAGE): ________ Note, inspection by DCMA is required prior to shipping. Destination Inspection is not allowed. 5. Source Acceptance Location (CAGE): ________ Inspection by DCMA is required prior to shipping. Destination Acceptance is not allowed. 6. Pack Location (CAGE): ________ Indicate if packaging will be done by an outside source. 7. Is this going to be manufactured in the US? ______ 8. POC name and email: ____________________________ 9. OPTIONS pricing: To allow you to price accurately, prices for options may differ from the unit prices for this basic requirement, depending on: -the quantities actually ordered on the executed option and -the future dates when ordered if agreed upon, prior to award, in writing. To explain further, contact the POC on this solicitation. List your option pricing here. 10. This quote is for NIIN _____________ Fill out the same thing for each other NIIN on this solicitation that you can quote. State no bid for any NIIN you cannot quote. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or…
Contacts
-
Telephone: 7176053629
Related links
Full record synced 3 days ago from SAM.gov (data extract)