SAM.gov · Solicitation

ADAPTIVE GAIN MODUL

  • Verified from source 6 days ago
  • Updated 8 days ago
Agency
DEPT OF DEFENSE
Office
DEPT OF THE NAVY | NAVSUP | NAVSUP WEAPON SYSTEMS SUPPORT | NAVSUP WSS MECHANICSBURG | NAVSUP WEAPON SYSTEMS SUPPORT MECH
Type
Solicitation
Kind
contract
Posted
Sep 11, 2026
NAICS
334419
Place
Notice ID
e159c8f701164410be5b9065345609c8
Source
SAM.gov
First seen
Sep 14, 2026, 12:41 PM UTC

Full scope

AE7 771-229-0595 [email protected] Invoicing and receiving report (COMBO) TBD TBD TBD See Schedule See Schedule TBD Emergency Acquisition Authority(EAA): This order is issued pursuant to Emergency Acquisition Authority. 1. Please quote a firm fixed price for the full repair of the item. 2. A beyond repair (BR)/ beyond economic repair (BER) price shall also be provided in addition to the repair price at time submission of quote. 3. Do NOT include the cost for shipping material as the government implemented shipping system or ATAC will be shipping/delivering material. 4. The vendor…

AE7 771-229-0595 [email protected] Invoicing and receiving report (COMBO) TBD TBD TBD See Schedule See Schedule TBD Emergency Acquisition Authority(EAA): This order is issued pursuant to Emergency Acquisition Authority. 1. Please quote a firm fixed price for the full repair of the item. 2. A beyond repair (BR)/ beyond economic repair (BER) price shall also be provided in addition to the repair price at time submission of quote. 3. Do NOT include the cost for shipping material as the government implemented shipping system or ATAC will be shipping/delivering material. 4. The vendor is required to comply with the Commercial Asset Visibility (CAV) of the asset(s) in this purchase order in accordance with NAVSUPWSSFA24. 5. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 6. The resultant award of this solicitation will be issued unilaterally per the BOA. 7. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. 8. Required RTAT: 60 days after receipt of assets 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the ADAPTIVE GAIN MODUL . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ADAPTIVE GAIN MODUL repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;53711 6262086; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part…

Contacts

Full record synced 8 days ago from SAM.gov (data extract)